Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Maecenas quis orci quis enim vehicula dapibus.
BAPV project-Rudong,Jiangsu / 1.05MW
China
Rudong,Jiangsu
BAPV project
Panel: 16,160 QS 65W
Capacity of Installation: 1.05 MW
Time tied to Grid: 2011 -9-30
Number and type of inverter:
8* 100KW ESI53B100AT
1*250KW ESI53B250AT